Equipment

Eastern Bridge Works

15,000 sq ft a day without prep., that needs to be done the day before

Eastern Bridge Works

Beveragebody Setup

Up to 10,000 sq ft project per day production
Sandblasting Capabilities
16" Shot blaster
We ship this truck right to the job site.
The Best for most jobs.

Eastern Bridge Works

Stacker Setup

30,000 sq ft production per day
Prep the day before
Larger job need to apply.

Eastern Bridge Works

Shotblasting Setup

10, to 15,000 sq ft per hour shot blasting
50,000 prep in 8 hour day concrete
5,000 sq ft a day for steel with sand blasting
Spraying and prepping 15,000 sq ft a day
All three set up 50,000 a 2 day project.

Production

Eastern Bridge Works
Eastern Bridge Works

12' pass Robot installs agg

This unit attached to pumps produce 100% Coverage area for aggregate

Production 144,000 sq ft 40 mil top coat system per day

Can spray without rock
Production 144,000 sq ft 80 Mil BDM coat
10 hour days

Eastern Bridge Works

Patent Pending Monster Truck

This beast produces the gallons needed to make it happen.

Total loaded computerized front and back Smooth running operation with maximum benefits for large projects.

Eastern Bridge Works

MADE IN THE USA

Complies with Buy America provisions.